Suba Bogotá

Integration of an electric fleet within an existing operational contract, in collaboration with a concessionaire.
0

Buses

1 K

Km per day

1

Number of routes

1 k

Passengers per day

1 Tm

CO2 avoided daily

The Suba project presented a strategic challenge as it involved acquiring and adapting an existing operation. We implemented a model that allowed us to integrate an electric fleet within an ongoing contract, working directly with the concessionaire. This approach demonstrated our ability to optimize pre-existing operational systems without compromising efficiency or sustainability.3

The key to the project was aligning with the concessionaire’s objectives, requiring precise planning and a flexible approach. We designed solutions that ensured the optimal performance of the electric fleet and addressed the operational challenges of public transport.

Additionally, this project strengthened our expertise in public-private partnerships and consolidated strategic relationships within the sector. Suba reflects our ability to innovate and create value in complex operational environments.