Suba Bogotá

Integration of an electric fleet within an existing operational contract, in collaboration with a concessionaire.
0

Buses

1 K

Km per day

1

Number of routes

1 k

Passengers per day

1 Tm

CO2 avoided daily

The Suba project presented a strategic challenge as it involved acquiring and adapting an existing operation. We implemented a model that allowed us to integrate an electric fleet within an ongoing contract, working directly with the concessionaire. This approach demonstrated our ability to optimize pre-existing operational systems without compromising efficiency or sustainability.3

The key to the project was aligning with the concessionaire’s objectives, requiring precise planning and a flexible approach. We designed solutions that ensured the optimal performance of the electric fleet and addressed the operational challenges of public transport.

VGMobility

Additionally, this project strengthened our expertise in public-private partnerships and consolidated strategic relationships within the sector. Suba reflects our ability to innovate and create value in complex operational environments.